Fairbanks X SERIES PR 5220 ETHERNET TRANSMITTER Instrukcja Użytkownika Strona 16

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 100
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 15
Section 3: Installing the Instrument
05/11 17 51209 Revision 2
3
Installing the Instrument
Before starting work, please read Chapter 1 and follow all instructions.
Further procedures:
Check the consignment: unpack the components specific to the application.
Safety check: inspect all components for damage.
Make sure the on-site installation is correct and complete including cables, e.g. power cable fuse
protection, load cells, cable junction box, data cable, console/cabinet, etc.
Follow the instructions for installation of the unit relating to application, safety, ventilation, sealing
and environmental influences.
Connect the cable from cable junction box or platform/load cell.
If applicable: connect other data cables, network cables, etc.
Connect the instrument to the supply voltage.
Check the installation.
Przeglądanie stron 15
1 2 ... 11 12 13 14 15 16 17 18 19 20 21 ... 99 100

Komentarze do niniejszej Instrukcji

Brak uwag